Love of my life baby boy born 11/11. One and done not by choice; 3 years of TTC yielded 4 MMC and 2 CPs, through 4 IUIs and 2 IVFs. Focusing on making the world a better place instead...and running.
Next day we sanded by hand with sheets of 3M p220 grit sandpaper just enough to k rough up the surface. Then dusted and rinsed with water.
Next day we taped the spindles and painted the railing and posts with general finishes gel stain in black x 2 coats. I day of dry time between coats.
General finishes high performance top coat is the vanish we used over the railing x 5 coats dry time between coats was 2hours.
Next day removed the spindle tape and taped the railing.
The spindles took two coats of primer (behr top quality, by the time he finished 63 spindles it was dry enough for coat two) and then two coats of white (behr alkyde, 8 hours dry time between coats). He bought a gallon of each but only needed a quart. The spindles were the worst part by far.
Looks amazing. And sounds exhausting. Great job. I bet it looks gorgeous at Christmas. I miss my old staircase at Christmas, all wrapped in garland and twinkle lights. If you don't do garland and twinkle lights on that gorgeous stair rail, you really should.
Next day we sanded by hand with sheets of 3M p220 grit sandpaper just enough to k rough up the surface. Then dusted and rinsed with water.
Next day we taped the spindles and painted the railing and posts with general finishes gel stain in black x 2 coats. I day of dry time between coats.
General finishes high performance top coat is the vanish we used over the railing x 5 coats dry time between coats was 2hours.
Next day removed the spindle tape and taped the railing.
The spindles took two coats of primer (behr top quality, by the time he finished 63 spindles it was dry enough for coat two) and then two coats of white (behr alkyde, 8 hours dry time between coats). He bought a gallon of each but only needed a quart. The spindles were the worst part by far.